(I) Proportioning

The quantity of the material has been taking likewise the Indian Standard Code 2185 – or as per the robustness need.

(ii) Mixing

Batching of the ingredients should be done exactly and mixing shall be done in a mixture to gain a homogeneous mix.

It shall go on until there is a uniform circulation of the materials.

(iii) Compacting

The Block should be compact by Vibro compaction and accomplish to the proper size without any broken edges.

(iv) Curing

The Blocks shall cure in a curing water tank or curing yard and should keep repeatedly moist for at least 14 days.

When the Blocks are cure in an immersion tank, the water of the tank should change at least every 4 days.

 (v) Drying:

After curing, the Blocks are dried for 2/3 weeks, and then only, they become fit to use for various intent.

If you do not follow it, diminution cracks are likely to show in walls.